Andover Continuum Integration

DATAKWIP ANALYTICS PLATFORM INTEGRATES WITH 54-YEAR-OLD BUILDING CASE STUDY
A CLOUD-BASED FACILITY ANALYTICS INTEGRATION
With no additional hardware, Datakwip integrated its Analytics Platform with a 15+ year-old, proprietary Andover Continuum energy management system at a 138,000 square foot office building with an EUI of 23.77.
Datakwip’s historical and real-time analytics uncovered multiple no and low-cost improvements, reducing the facility’s energy use by 13.5%. The payback period for all related expenses, including Datakwip’s 3-year contract was less than nine months
SAVINGS OPPORTUNITIES IDENTIFIED BY DATAKWIP
- 450,000 kwh annual energy savings resulting in $56,500 savings in verified annual energy savings through low or no cost changes, resulting in a simple payback period of 9 months
- $100,523 in realized incentives paid from energy provider in addition to annual energy savings
- $842,014 asset valuation increase based on only low-cost ECM’s
ENERGY CONSERVATION MEASURES IDENTIFIED INCLUDED
- Building Optimal Start/Stop Tuning
- Condenser Water Reset
- Runtime Optimization
- Inter system Sequence Modifications
Simple Payback Period of 9 months from reducing annual energy consumption. The 9-month simple payback period does not include the $100,523 in incentives from the local energy company.